Table of Contents
Introduction
The Jagadal Suttatti New Rail Line, a vital segment of the Bagalkot-Kudachi New Line Project, is set to revolutionize railway connectivity in the region. This article explores the project’s overview, details, scope of work, and its significance in bolstering transportation infrastructure.
Jagadal Suttatti New Rail Line: Overview of the Project
Under the auspices of the Chief Administrative Officer, Construction, South Western Railway (SWR), tenders have been issued for the construction of the Jagadal-Suttatti new rail line. This crucial endeavor encompasses a 28.5-kilometer stretch between Jagadal (excluding) and Suttatti (excluding), forming a pivotal part of the larger 142-kilometer Bagalkot-Kudachi New Line Project. The project aims to enhance rail connectivity and infrastructure, addressing the burgeoning transportation demands of the region.
You can also read: PAYTM PAYMENT BANK RBI BAN: UNDERSTANDING RBI’S RESTRICTIONS ON PAYTM PAYMENTS BANK!
Jagadal Suttatti Rail Line Map
Jagadal Suttatti Rail Line Project Details and Scope of Work
The construction project involves laying a new broad gauge single line between Chainage 105/500 at Jagadal and Chainage 134/000 at Suttatti. This stretch is designed to facilitate trains with a maximum speed of 160 km/h and an initial axle load of 25 tonnes. The scope of work encompasses various facets including civil, building, electrical, signaling, telecommunication, and track works. Notably, the project entails the construction of eight major bridges, thirty-nine minor bridges, thirty-six road under bridges, one road over bridge, and two subways, along with associated approaches.
You can also read: Successful Completion Of Pune To Miraj Railway Line Doubling: Enhanced Speeds Await Trains!
Key Features Of Jagadal Suttatti New Rail Line
- Advertised Value: The project is valued at INR 3,682,203,402.00, indicating significant investment in regional rail infrastructure.
- Period of Completion: The project is slated for completion within 21 months, emphasizing the urgency and commitment to timely delivery.
- Length of the Line: Spanning 28.5 kilometers, the new line promises to extend railway connectivity to previously underserved areas.
- Proposed Stations: The project includes three proposed stations, strategically located to optimize passenger access and convenience.
Jagadal Suttatti Rail Line Proposed Stations
- Rabakavi Halt Station: Positioned at CL Km: 109/075, featuring one high-level platform (HL PF) of 270 meters, and essential railway yards to facilitate smooth operations.
- Terdal Crossing Station: Located at CL Km: 116/950, equipped with one HL PF of 570 meters, one RL goods PF of 700 meters, and comprehensive railway yards catering to diverse operational requirements.
- Harugeri Crossing Station: Strategically situated at CL Km: 116/950, boasting two HL PFs each of 570 meters and essential foot over bridges/subways to enhance passenger accessibility.
You can also read: Change In Train Services Between Solapur To Hosapete And Vijayawada To SSS Hubballi!
Significance and Conclusion
The Jagadal Suttatti New Rail Line project signifies a significant stride towards enhancing railway connectivity and infrastructure in the region. By bolstering transportation networks and facilitating smoother travel, the initiative addresses the evolving needs of commuters and contributes to regional development. As construction progresses, the project is poised to unlock new opportunities and foster economic growth in the surrounding areas.
You can also read: MONKEY MAN TRAILER UNVEILED: SOBHITA DHULIPALA VENTURES INTO HOLLYWOOD WITH DEV PATEL’S REVENGE SAGA!